Site and drain check
Measure the bay and confirm drain fall before moving the unit

Ahmadi
Jacuzzi installation in Zour begins by measuring floor area and confirming tile base can bear full water weight. We run supply lines from the main manifold and connect waste carefully to a steady fall toward the drain.
Power generation plants in Zour have modern bathrooms with reinforced concrete floors and heavy-duty drainage designed for water loads. The challenge here is extreme ambient temperature from industrial cooling processes, which rapidly heats exposed metal pipes. We insulate cold water lines with 50 mm foam to prevent further heating and loss of pressure.
Zour sits in Ahmadi governorate where giant power generation stations operate intensive water-cooled systems.
We measure cold and hot water pressure at inlet and outlet because ambient heat affects pump pressure balance.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if ambient temperature exceeds 50°C the pump loses power. We fit a cooling fan on the control box and relocate the pump itself to a cooler room or shade if possible.
Yes, PVC pipes soften and may bend or split at 60°C. We use heat-resistant CPVC or wrap PVC in reflective metal sleeving before tile is fixed.
