Position and height
correct mounting height marked before any fixing begins

Ahmadi
Washbasin installation at Zour begins by measuring the central drain line for the power station and checking the treatment tank height. We extend water pipes from the main supply point and mount the basin at height to drain completely without trapping warm or cold water.
Zour facilities include control buildings, labs and worker bathrooms, each tied to one drain line running to the treatment centre. Metal pipes can be affected by heat from nearby generation units, so we insulate exposed sections and test flow at high temperatures. Basin placement must sit high enough to ensure steady slope toward the drain without a lift pump.
Zour is in Ahmadi governorate and houses a power generation plant, where hot water and insulated piping are core infrastructure.
Zour waste lines are tested with hot water from boilers for thirty minutes before final acceptance because leaks surface under thermal stress.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, copper pipes expand with station heat, so we fit them with flexible clips that allow movement. We test flexibility by running hot water for a period before switching to permanent operation.
We install cleaning points at regular intervals along the drain for easy access. We use slightly larger diameter pipes than standard to reduce sediment velocity and allow regular flushing.
