Frame and tray level
Frame and tray set perfectly flat so water drains fully

Ahmadi
Shower cabin installation in Jaber Al-Ali requires precise measurement of the bathroom width, depth and floor slope before we start. We set the metal frame on adjustable legs, seal the glass with antifungal silicone and test the drain under full water flow.
Jaber Al-Ali houses are older and bathroom floor levels vary widely, some raised slightly above corridors and others below. The floor trap is often positioned away from where the cabin needs to go, so we run a new waste pipe under tiles from cabin to trap. Walls sometimes show old damp, so we use antifungal silicone and leave an air gap behind the cabin to let the wall dry.
Jaber Al-Ali sits in Ahmadi and is an older residential area with family houses that have uneven bathroom floors.
The cabin is left unused for 24 hours after handover because silicone needs full time to bond properly.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we box the pipes in with plasterboard or run them behind the cabin frame. If they sit far from the cabin position, we install without moving them.
We clear and clean it before starting installation, because the new cabin needs a clear drain to work properly. Cleaning prevents water backflow later.
