Frame and tray level
Frame and tray set perfectly flat so water drains fully

Capital
Shower cabin installation in Mubarakiya Camps usually goes over old floors with irregular fall and unplevel walls. We set the frame on a levelling base and anchor it with long bolts through brick. We test the drain carefully because old pipework may be partially blocked.
Mubarakiya Camps are old houses with brick walls and damp floors and worn waterproof layers. Bathrooms are tight with concrete bases that may be cracked. Before setting a cabin we repair any seepage from the slab and sometimes raise the trap position, because a cabin sitting over standing water produces odour.
Mubarakiya Camps near the souk in Kuwait governorate are old dwellings with worn earthen floors.
We inspect old drain lines by camera and rod before connection because pipes may hold sediment and roots.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fill cracks with high-strength epoxy injection before laying the levelling base. This prevents water seeping under the cabin and protects the base structure from erosion.
Old brick is weak and breaks easily under drilling. We use large-bore expansion bolts set deep and spread load with a metal plate at each fixing point.
