Waste outlet check
Height and position confirmed before the shower tray is set.

Capital
Shower installation in Mubarakiya Camps requires working with lightweight walls and older embedded supply pipes. We locate existing pipes, carefully pull additional lines and secure the shower tightly to exposed walls.
Mubarakiya Camps buildings are older with thin brick walls and visible iron pipes under plaster. Before fitting we check wall thickness and stability by tapping because these walls cannot take many holes. We run new pipes alongside existing risers and mount the shower head with strong galvanized brackets. Waste bends from the head toward the trap with steady fall and we seal openings with moisture-resistant compound.
Mubarakiya Camps sits near Mubarakiya market in Kuwait city centre where older buildings have historical character.
Old iron pipes in these camps need full inspection before new lines are connected to avoid leaks from corrosion.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test the wall first by tapping and use strong toggle anchors that pass through the full wall depth. If the wall is very weak we mount a metal frame on the floor instead.
If plaster is thick enough and crack-free we cut it carefully, run pipes inside and replaster. But usually pipes stay visible for protection from damage.
