Waste outlet check
Height and position confirmed before the shower tray is set.

Farwaniya
Shower installation in Ardhiya Industrial starts with positioning on an external wall to tap into the central supply line. We set the head level, secure the mixer firmly, test water pressure and seal all joints before completion.
Industrial buildings in Ardhiya sit on thick concrete slabs with partitioned walls dividing workshops from break areas. A shower in the staff zone needs fast drainage because the concrete floor is level with no natural fall. We run the waste pipe under the slab with a calculated slope, or along an interior wall to reach the main drain near Ardhiya Co-op.
Ardhiya Industrial lies in Farwaniya governorate, where hundreds of workshops and factories rely on dependable facilities for workers.
Water pressure and drainage are tested together because leaks under thick concrete slab cannot be found later.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we check the pipe diameter and current water pressure first. If the line is undersized we run a new pipe from the main meter to ensure steady shower flow.
We use copper or tested plastic pipe rated for high pressure before the concrete is poured. Drain is tested under strong flow and slope is checked with a level before handover.