Waste outlet check
Height and position confirmed before the shower tray is set.

Farwaniya
Shower installation in Firdous begins by choosing the bathroom wall and levelling the head with floor tiles. We run supply from the tank, fit a siphon and slope the waste pipe, then test pressure and seals.
Firdous houses are relatively modern with spacious bathrooms and sloped floors built for fast drainage. Nearly every home has a roof tank with supply pipes hidden inside walls. The main bathroom shower needs firm connection to the existing supply lines and a modern trap under new tiles. Waste slopes steadily to the main sump near Firdous Co-op on Sixth Ring Road.
Firdous sits in Farwaniya governorate on Sixth Ring Road, a modern residential district with regular planning.
We check tile floor slope because level floors need extra excavation for safe drainage.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the floor slopes to an existing trap we measure distance and fall first. Usually we cut a narrow channel under current tiles for the siphon without raising the floor.
We check water pressure from tank and main meter before connection. If pressure is low due to old pipes we suggest meter cleaning or replacing the first-stage pipes for better flow.
