Waste outlet check
Height and position confirmed before the shower tray is set.

Capital
A shower installed in Salhiya means modern walls and carefully sloped floors. We position the head at the right height, connect the waste to recommended fall and test every joint for leak-free operation from day one.
Modern Salhiya residential towers have contemporary bathrooms with well-sloped floors and hidden pipe cavities. We trace existing pipes in the walls to see if they reach a floor strainer or connect directly to the main line. Properly pitched floors let us fit a standard head without a raised tray, making later maintenance simpler.
Salhiya lies near Sheraton Hotel and Salhiya Commercial Complex, a modern zone of high-grade residential buildings where shower installation is straightforward.
Before leaving the flat, we run hot and cold together to test pressure balance and flow rate from the new head.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually no, if the pipes are positioned correctly with good fall we connect the head directly. We open the wall only if pipes need adjustment or moving to the new height.
Two to three hours if pipes exist and walls are ready. This includes positioning, full testing and sealing the body with moisture-resistant compound.
