Frame and tray level
Frame and tray set perfectly flat so water drains fully

Capital
Installing a shower cabin in Salhiya near Sheraton Hotel requires understanding modern bathroom design and hidden drains. We set the frame precisely level, connect hot and cold from visible pipes and seal the existing tiles around the cabin.
Salhiya has luxury hotels and apartments with spacious bathrooms featuring hidden pipes in walls and floors. We check engineering drawings or measure directly to locate existing pipes and route the drain toward them. If the cabin needs a new waste line we dig carefully deep in the floor and run the pipe with steady fall.
Salhiya is a commercial and hotel centre in Kuwait governorate, known for tall modern buildings and luxury facilities.
Every pipe joint is tested under high water pressure because deep floors in this area make any leak difficult to fix later.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We request engineering plans from the building first, and if unavailable we use measurement and logic to trace the existing drain line from other fixtures. We dig a small test hole to confirm position before full work.
Yes, but there must be a drain nearby or we run a new waste line under the floor. We measure the required fall and test drainage before closing up the bathroom.
