Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Ahmadi
Fixture installation in Wafra Agricultural starts by understanding the farm or poultry facility's supply and drainage points. We run lines from the roof tank or pump, fit fixtures at diameters matching the required flow, and test pressure and seals at each connection before handover.
Wafra Agricultural farms contain mixed buildings: worker housing, animal sheds and stores, each needing separate drainage points due to different loads. Sheds need wide floor traps across the entire floor, while the worker house needs standard bathrooms with secure fixtures. We check groundwater salinity before choosing pipe materials, because farms near wells often need corrosion-resistant pipes instead of standard steel.
Wafra Agricultural sits in Ahmadi governorate, an agricultural working zone where buildings are scattered and drainage demand is uneven.
Each fixture is tested under running water for at least three minutes before moving to the next one.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we match pipe diameter to the expected water volume. A poultry shed drains daily wash water in large amounts, so we use fifty millimetre or larger pipes. A house bathroom works fine with thirty-two millimetre at a steady fall.
Ordinary steel rusts quickly in salty water. We test the water first, and if salinity is high we run copper or stainless steel pipe from the well all the way to the fixtures.
