Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Abdullah Al-Salem begins by checking the bathroom wall for hidden pipes behind it. We mark the mounting height based on the users, then drill precisely and secure the steel brackets. We run hot and cold supply lines from existing feed pipes and connect the waste with a steady fall to the trap. Before handover the basin runs at full pressure and every joint is checked for leaks.
Abdullah Al-Salem houses are mostly newly built with small guest bathrooms near the front entrance, and walls in these bathrooms are usually solid concrete with no cavities. Because the wall is dense, we select heavy-duty brackets and long bolts that penetrate deep enough. Drilling concrete requires a powerful electric drill and slow progression to avoid slipping, and we clear dust from the hole before inserting the anchor nuts.
Abdullah Al-Salem sits in Kuwait governorate near the British Embassy, a modern residential zone known for newly designed villas and apartments.
We test bracket installation with strong manual pull before the basin attaches to ensure no movement.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use high-grade bolts longer than a third of the wall thickness and drill within pre-marked lines precisely. After installation we tighten bolts with a torque wrench and test stability with strong hand pull before final attachment.
We run new supply lines through channels inside the wall or surface-mount pipes on the outer wall with a decorative cover. Choice depends on bathroom layout and space behind the tiles.
