Wall position check
Marking the correct height and anchor points before any drilling

Farwaniya
Wall-hung basin installation in Ardhiya Industrial starts with raising the wash point above the factory or warehouse floor to prevent water pooling and dampness. We set the height for worker use, drill the concrete wall, fix the bracket with heavy anchors and connect supply and waste efficiently.
Ardhiya Industrial buildings have thick concrete walls and existing water lines usually run near the roof or are buried in wall chases. We trace these pipes carefully before drilling to avoid breaking them, and choose a location that does not obstruct equipment movement. The basin waste can connect to an existing floor drain line or run directly to an outdoor yard sump.
Ardhiya Industrial sits in Farwaniya governorate, an area known for concentrated factories and warehouses where workers need safe wash points.
We test the bracket by pulling hard on the empty basin before handover because industrial walls demand anchoring that cannot fail.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a diamond-core drill and measure safe clearance from any known reinforcement or internal pipes. Heavy anchors go in slowly and we inspect the wall around the hole for cracks before mounting the bracket.
Yes, but that requires running a new waste pipe under the floor or along the wall. We choose the shortest route with least interference to operations and test adequate fall before final bracket fixing.
