Wall position check
Marking the correct height and anchor points before any drilling

Farwaniya
Wall-hung basin installation in Rehab starts by lifting the load off the floor and rerouting supply and waste lines within the wall cavity. We locate the fixing points on studs, run copper pipework and pressure-test before handover.
Rehab houses are two or three storeys with small bathrooms on thin outer walls, meaning waste pipe must slope quickly toward the main stack. Wall-hung basins allow pipework to pass beneath without obstruction, and near Rehab Co-op most homes share similar construction. We ensure the waste outlet sits at least 150mm above the floor trap inlet to stop backflow.
Rehab sits in Farwaniya, an older residential district where tight bathroom spaces benefit from wall-hung basins.
We pressure-test every joint to 10 bar because Rehab's thin walls leave little room for repair if a leak develops.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, because the weight of water and ceramic needs solid backing within the wall. We open the wall to add metal or timber blocks and finish with trim before fixing.
Copper pipes need no routine maintenance if properly installed and bled of air. We pressure-test before closing the wall and record the route so any technician can find it later.
