Wall position check
Marking the correct height and anchor points before any drilling

Ahmadi
Wall-hung basin installation in Fahad Al-Ahmad starts by marking the wall height to suit the household users. We run hot and cold supply from existing pipes, fix heavy-duty wall brackets into the masonry, connect waste to the floor trap line and test every joint.
Fahad Al-Ahmad houses are typically newer with bathrooms built on thick concrete walls where pipes already run inside the wall cavity. This means installation is faster because we find supply and waste points without breaking walls. We locate the hot and cold lines inside the wall, test their pressure before connecting, and confirm the waste slope from basin to trap is adequate.
Fahad Al-Ahmad sits in Ahmadi governorate, a modern residential suburb where houses are built with solid concrete construction.
Each wall bracket is tested by pulling the empty basin downward before filling to confirm the wall holds full load.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the wall is thick concrete, as it is in most Fahad Al-Ahmad homes, no reinforcement is needed because concrete handles the load easily. We use heavy metal screws and anchors that penetrate the wall to sufficient depth.
Usually half a working day, including marking height, fixing brackets, making connections and testing. If the wall needs minor breaking for new pipes it may take a bit longer.
