Wall position check
Marking the correct height and anchor points before any drilling

Jahra
Wall-hung basin installation in Jahra New starts with checking wall and build quality to confirm suitability for fixing. We select the mounting point on the wall and drill carefully, then seat steel brackets firmly into the concrete body. Supply and waste pipes connect at true angles to ensure proper slope throughout. Everything is tested under high pressure before leaving the site.
Jahra New was built recently with strong walls and dense concrete, offering secure fixing for a wall-hung basin. Bathrooms here are modern with thoughtful design, and floor traps sit in predictable locations. We tap and probe each wall to rule out voids or cracks that could weaken the bracket. If the distance from basin to trap is long we use larger-diameter pipes to improve flow rate.
Jahra New sits in Jahra governorate near Jahra Mall and Jahra Hospital, a zone of rapid residential expansion.
Fixing basins to new walls requires concrete to be tapped to check density before selecting anchor size.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, new concrete is dense and strong, providing excellent fixing. We tap-test every wall before drilling to rule out any internal voids or weak spots.
Safe distance extends to three metres if slope is correct and pipe diameter is adequate. We calculate it precisely before fixing to ensure water never stalls or pools.
