Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Mansouriya requires choosing a wall position in a bathroom that may be old or recently built. We test wall strength by drilling a sample hole before anchoring heavy-duty building bolts. Hot and cold water are connected from main pipes and waste is routed to a sloped line that is tested thoroughly.
Mansouriya houses vary in age, some old with heavy stone or concrete walls and others newly built. Heavy walls need strong building anchors that penetrate inner layers. Each bolt is tested after fixing by lifting the basin with one hand. If the basin sits near Mansouriya Co-op, waste pipes may run beneath the main street, so we check for adequate fall throughout. Old pipes may need a section replaced if they are corroded or clogged with mineral deposits.
Mansouriya is a residential area in Kuwait governorate near the Fourth Ring Road, mixing older homes with newer construction.
Old walls are inspected for cracks that might widen when heavy fixing bolts are driven in.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Wooden shelves are weaker than wall bolts in stone and may sag under water weight. We prefer to reinforce the wall with a cement patch around the fixing area then anchor heavy bolts through it. This spreads the load across a wider surface and prevents cracking.
Old pipes are tested first by pumping water at high pressure. If they pass and do not leak we leave them. If they are blocked or corroded we replace only the visible section or run new pipes in parallel as needed.