Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Shuwaikh starts by setting the height to suit the user and the space available. We clean the wall, mark the bolt positions, drill and anchor to the right depth. We run hot and cold supply and waste pipe then pressure-test for leaks before finishing.
Shuwaikh buildings mix warehouses, offices and small flats, many with narrow bathrooms and no dedicated floor drain. The wall-hung basin is the first choice here because it saves floor space and needs no deep floor drain. We check wall quality and brick thickness before fixing, as light walls in some older buildings may need extra bracing.
Shuwaikh lies in Kuwait City near Shuwaikh Port and the Science Museum, a mixed-use area where commercial and residential activity meet.
Before handover we fill the basin and open the waste at full flow to confirm no water leaks from the wall anchor joints.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the wall thickness and brick strength first, and if it is light we use longer expansion bolts with cement packing. This spreads the load deeper and prevents collapse.
The tight spaces in Shuwaikh buildings make the wall-hung basin the only real choice. There is no floor space, and a floor drain may not exist or would need wide tile breaking.
