Wall position check
Marking the correct height and anchor points before any drilling

Capital
Installing a wall-hung basin in the Industrial Area requires care with heavy walls, moisture and vibration from machinery. We choose a spot away from pipes and cables, drill deep into reliable concrete and confirm anchor stability before mounting.
Factories in Shuwaikh Industrial have thick concrete walls, wide corridors and simple work bathrooms with no frills. The wall-hung basin here must handle heavy use and repeated washing with harsh detergent. We inspect the concrete for cracks and dampness, choose stainless steel bolts and run pipes on a clear fall so mineral deposits do not collect.
Shuwaikh Industrial sits in Kuwait City, a district of factories, logistics services and warehouses requiring robust drainage solutions.
We test each anchor under doubled manual load before mounting the basin to ensure it does not slip under repeated pressure.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if we choose stainless steel bolts and a tough industrial ceramic basin. We test every anchor under doubled load and ensure the waste handles high flow without blocking.
We choose stainless steel fixing bolts instead of plain iron, and run copper or copper-nickel pipe for the supply. We pressure-test every joint with water before handover to rule out metal ion leaks.
