Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Nuzha starts by setting the height based on the household's needs. We mark bolt positions in solid concrete away from existing pipes, run hot and cold supply lines and test every joint before fixing the basin itself.
Most Nuzha villas near Nuzha Co-op were built in the 1990s with thick concrete walls, which gives us the depth needed for long-shanked bolts. We first scan the wall for existing pipes using a metal detector to avoid drilling into a live line. Once we find the safe zone we drill four anchor points and test the tension of each bolt after fixing to ensure the basin does not move.
Nuzha is located in Kuwait governorate, a residential district of spacious villas with sturdy interior walls that suit secure hanging-basin installation.
We test bolt strength by loading the test weight before handover because fixture failure is a safety risk.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a specialized metal detector that spots copper and steel pipes before we drill. If we find one, the four anchor points shift at least 30 centimetres clear.
After site survey and safe scanning, the drilling, fixing and testing takes about two hours. If we need to reroute existing pipes or repair the wall, the job takes longer.
