Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Qadisiya happens in residential flats near the sports stadium. We identify the strong wall, fix the basin with a steel metal bracket and test complete waste and supply before finishing.
New Qadisiya flats near the sports stadium have small bathrooms with solid concrete walls. A wall-hung basin is ideal because the walls are strong enough and space is tight. We test-drill the wall to locate solid points and avoid electrical or plumbing lines. The bracket is fixed with galvanized steel bolts into the concrete wall centre with metal washers under bolt heads. The waste extends at a regular angle to the floor trap or connects to the existing drain line.
Qadisiya sits in Kuwait governorate near Kuwait SC stadium, a district of closely spaced residential apartment buildings.
The basin-to-wall joint is tested with strong hand pull, then the basin is filled completely to check for waste leaks under full load.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if the wall is thick and strongly load-bearing, but each basin must be separated by at least 60 cm and fixed with separate bolts. Each is tested independently before connecting to a shared drain line.
We test the existing line first by running water to check flow. If it is blocked we clear it, and if it is damaged we run a new waste pipe from the basin to the floor trap.
