العربية Call now

Farwaniya

Wall-hung basin in Rai Industrial

Wall-hung basins in Rai Industrial are installed in industrial facilities and offices near The Avenues Mall. We test the wall first, set the position, drill anchors, mount the bracket and run full-pressure tests on supply and waste.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Rai Industrial contains factories, workshops and office buildings with thick, strong concrete walls that bear heavy loads. Bathrooms in these buildings need sturdy basins that withstand heavy use, and a wall-hung basin offers easy servicing and cleaning underneath. Near The Avenues Mall we find offices and commercial-spec bathrooms where we focus on bracket strength and connection durability because usage is very intensive.

Rai Industrial lies in Farwaniya governorate, an industrial and commercial zone adjacent to a major shopping centre.

We test every joint with fixed torque and check bolt tightness one week after installation to ensure no fastener has loosened.

What the installation covers

Wall position check

Marking the correct height and anchor points before any drilling

Bracket installation

Fitting wall brackets rated to carry the basin weight safely

Supply line connection

Connecting hot and cold lines with new isolation valves fitted

Trap and waste fitting

Setting a new trap and connecting to the waste run at the right fall

Mixer and fittings

Fitting the mixer, strainer and all trim with sealed connections

Pre-handover test

Pressure check, waste flow test and full leak inspection before leaving

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Wall-hung basin

Back to Wall-hung basin

Other services in Rai Industrial

Common questions

Questions about Wall-hung basin in Rai Industrial

Need someone now? The emergency line is open any hour.
+965 9668 4964

Can multiple wall-hung basins be mounted in a row in an employee washroom?

Yes, but we ensure each section of wall has enough fixing points between basins. We leave at least 60 centimetres between each basin to avoid fingers overlapping. A shared waste pipe needs steady fall and strong drainage.

Do concrete walls need special treatment before fixing?

No, strong concrete needs no treatment. We test it with a trial hole and use high-spec expansion anchors set to proper depth. If the concrete is very porous we use stronger mechanical anchors instead.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp