Wall position check
Marking the correct height and anchor points before any drilling

Mubarak Al-Kabeer
Wall-hung basin installation in Sabhan Industrial typically serves break rooms and visitor areas in large warehouses and factories. We select a location with thick concrete backing, run water lines from the main branch and connect waste to the facility's drainage. Full-pressure testing confirms quality.
Sabhan warehouses and factories have very strong industrial construction with thick concrete walls, large central water pipes and robust underground drainage. The wall-hung basin fixes easily to dense concrete and connects readily to the thick distribution pipes nearby. Waste drains to a central sump or main sewerage lines serving the entire facility.
Sabhan Industrial lies in Mubarak Al-Kabeer governorate, a specialist zone for warehouses and factories on a solid industrial base.
Before delivery, the basin runs at monitored pressure to check all joints and verify zero leaks in the system.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes absolutely, the thick industrial concrete here is ideal for direct fixing. We use heavy expansion bolts at multiple points on a sound wall for long-term safe load-bearing.
Yes, we first test pressure and quality in existing pipes then branch from them with new copper pipes of proper size for the basin. Waste connects readily to the main collection lines already there.
