Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Mubarak Al-Kabeer
Installing a Western toilet in Sabhan Industrial serves factory and warehouse workers who need strong, reliable drainage. We set the pan on concrete floor, route the drain for heavy-duty use, and test at full capacity.
Sabhan Industrial buildings are warehouses and workshops with heavy concrete floors and drains designed for heavy use. Level, strong floors make installation easier but the drain may run far along the building, so we route the waste over a long distance while keeping slope steady. In wet workshops there are often floor traps close by, so we connect the pan directly to them and the floor stays safe for daily cleaning.
Sabhan Industrial is a factories and warehouses zone in Mubarak Al-Kabeer governorate, with concrete floors and heavy-duty use.
We test flushing under full water load multiple times because industrial bathrooms endure heavy daily use.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we extend waste pipes over many metres while maintaining even slope. We use heavy-duty pipes and support them under the concrete floor to withstand intensive use.
No, if slope is correct and pipes are large enough. We test flushing under full tank pressure to confirm complete evacuation even at the end of the long run.
