Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Bathtub installation in Dasma starts with checking the existing drain outlet and verifying floor level. We set the unit perfectly flat on a solid cement base, connect the waste and overflow lines, seal every joint and run a pressure test.
Dasma houses near the city centre often have compact master bathrooms with older floors needing levelling before the unit goes in. We check the floor level carefully and raise the bathtub on a cement base if needed to ensure a steady fall to the trap. The waste run is usually short to the outlet, so we test every joint for leaks and seal tightly around the rim.
Dasma sits in Kuwait governorate near the city centre, a mature residential district where bathrooms are compact and floors are often stepped.
Before completion we fill the bathtub with water and leave the drain open for one hour to verify the integrity of all joints.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We check the slope first with a long level. If variations are small we raise the tub on a thin cement base, otherwise we recommend spot relevelling under the unit footprint only.
The sealant around the rim needs 24 hours to cure fully. We advise against filling the tub before then to ensure the seal holds at first use.
