Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Farwaniya
Wall-hung toilet installation in Hassawi begins by checking the concrete wall to anchor the frame solid before any connections. We run supply and waste lines from the source, test full water pressure, and finish with cistern and seat fitting.
Hassawi houses have thick concrete walls and ground-floor bathrooms with established waste runs under the tiles. When installing a wall-hung toilet we probe the wall first to avoid voids in the concrete before drilling anchor bolts. The frame must tie into an existing waste line with adequate fall, so we run a new branch if the height needs changing. We match the new pipe diameter to the main waste line and couple it securely before the wall is sealed.
Hassawi is located in Farwaniya governorate, an older residential district where houses have solid concrete walls and traditional waste systems.
We test cold and hot pressure together at every joint before handover because pressure reveals even small leaks.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the old line has the right diameter and adequate fall from the frame to the drain. We measure the fall first and test water run, and if it is too shallow we branch a new line from the main stack at the correct angle.
The frame needs bolts driven 10 to 15 cm into sound concrete. We drill 12 cm deep and fit heavy-duty anchor bolts, then test frame rigidity by hand before running pipes through it.