Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Ahmadi
Wall-hung toilet installation in Zour addresses the massive buildings of power generation stations and industrial transformer halls. We anchor with heavy bolts in concrete walls, run lines under high pressure, and test safety before handover.
Power station buildings in Zour are vast and tall with thick concrete walls supporting heavy mechanical systems, allowing secure frame anchoring without concern. Supply and waste pipes need larger diameter to handle high pressure and heavy daily volume. We follow drainage falls carefully to the main collection point near Zour station's treatment zone.
Zour lies in Ahmadi governorate, a power generation and industrial facility zone where giant concrete buildings house complex mechanical systems.
Drain and supply pressure are tested together under full load for fifteen minutes to prevent frame collapse under stress.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We select reinforced metal frames rated well above minimum load. Stability is tested under excess weight before final cistern installation.
We fit full-inch copper supply pipes and four-inch high-density plastic waste lines. Large diameters maintain steady pressure even under intensive use.