Frame and tray level
Frame and tray set perfectly flat so water drains fully

Ahmadi
Installing a shower cabin at Zour requires understanding the central drainage serving the power plant and seawater cooling system. We set the frame on a solid base, run the waste to the nearest collection point, test pumping and flow under full pressure.
Zour power plant has industrial buildings with engineered floors and unified drainage connected to high-pressure pumps, because gravity alone cannot shift the dense seawater. We confirm the cabin drains into the correct waste line and not into seawater cooling pipes or desalination tubing. We test flow pressure before final fixing because strong pumping can force water back up through the trap if the line is not airtight.
Zour sits in Ahmadi governorate where a major power plant needs precise sealed drainage for water used in cooling and industrial processes.
We test cabin drain direction before sealing because confused pipes may run toward cooling lines and disrupt operations.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we must identify the correct line first from plant engineers because the station has multiple lines for seawater, fresh water and industrial waste. We trace the line from the trap to the correct pump station before any connection.
We fit a one-way valve in the drain line under the cabin that lets water out only. If external pressure rises the valve closes and protects the cabin and floor from flooding.