Position and height
correct mounting height marked before any fixing begins

Mubarak Al-Kabeer
Washbasin installation in Abu Fatira starts by inspecting the existing bathroom and available floor traps around the living spaces. We position the basin based on the nearest waste point, run supply from the rooftop tank and test pressure and flow before completion.
Abu Fatira residential houses have guest and main bathrooms with flat ceramic floors and floor traps directly under the foundation. We measure depth and fall before choosing basin height, because flat floors need steady waste fall or water pools. Where the trap sits far from the basin, we run the pipe under ceramics while keeping flow correct by checking every joint.
Abu Fatira sits in Mubarak Al-Kabeer governorate, a middle-income family residential area where homes are modest and water and sewage services are centralized.
The new waste line is tested by running warm water for a full three minutes to check every metal or plastic joint for leaks.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we use wet-cutting tools to reduce dust and damage to nearby ceramics. After laying the pipe we fill channels with moisture-resistant cement then place matching new tiles where available.
We disconnect the old pipe and inspect it internally for deposits and rust. If the fall is adequate we replace it with modern plastic pipe and test under full flow before completion.
