Position and height
correct mounting height marked before any fixing begins

Capital
A washbasin installation in Watiya starts by checking the existing waste line and the fall of pipes under tiles. We choose the basin position so the waste reaches the floor trap with steady slope and no sags. We run hot and cold supply from nearby roof tanks or risers and seal every joint before testing.
Old Watiya houses near the city walls have small guest bathrooms with low floors and traps set close to walls. This means a short waste run but limited fall because the ground is level. We use a level to check the actual slope and choose pipe diameter by that. If the fall is insufficient we fit a wall-hung basin with a higher outlet instead of a floor model. Before final install we slightly raise the trap if the site allows it.
Watiya lies in Kuwait governorate, a historic residential district tied to the old city walls, where streets are narrow and houses are tightly built.
Every waste joint is tested under full flow for two minutes to catch any leak before walls are sealed.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if the foundation allows and the main drain is close to the surface. We raise it 5 to 10 centimetres and reset tiles round its edge with a new level to ensure steady slope.
We run a heat-resistant copper or plastic pipe alongside the cold line with thermal wrap to prevent heat loss. We test pressure and flow before connecting the basin to ensure true hot water reaches it.
