Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Capital
Western toilet installation in Dasman starts with precise floor levelling since most high-rise apartments here have solid marble finishes. We connect supply and waste, fit the cistern, then test every joint for leaks before handover.
High-rise towers in Dasman have narrow bathrooms with elevated marble floors, meaning waste pipes often already sit high above main sewerage. We check existing waste fall and test incoming water pressure because high pressure in tall buildings can leak from weak cistern joints. If we must open the floor, we cut precisely beside the trap wall to minimize damage.
Dasman sits in Kuwait governorate on the Arabian Gulf, an area of modern high-rise blocks where every toilet is always beside a fixed floor trap.
Every joint is tested under full flow from both cistern and hot supply together to check leaks because tall buildings put higher pressure on connections.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but water supply in Dasman typically comes from the bathroom back wall. Moving the cistern to a side wall means running the pipe under marble flooring, which needs a longer cut and matching marble replacement.
When we test the connection we measure pressure first. If it exceeds 4 bar we fit a pressure reducer on the supply line to protect cistern and toilet joints from leaks. This is common in tall towers.
