Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Capital
A western toilet installation in Shuwaikh begins by setting the pan level and checking it does not tilt in any direction. We run the cold and hot supply lines from the overhead tank, regulate flow pressure, and connect the pan outlet to the waste pipe at a steady angle that stops water pooling.
In Shuwaikh residential apartments and shops near Shuwaikh Port, the western pan sits 40 centimetres above the floor and needs a solid concrete base to stop it moving. The overhead tank feeds it directly, and water flows at a set pressure when the valve opens. The pan outlet must reach the floor trap at a fall of at least one centimetre per metre, or water will back up in the pipe.
Shuwaikh lies in Kuwait governorate near the port and museum, where most residential and commercial units connect to a fixed sewerage network.
After installation, we fill the tank and open the valve five times in succession to check for leaks at the pan base.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we raise the concrete base an extra five to ten centimetres and set the pan on top. The tank stays connected to the wall valve at the same pressure.
We check the valve, floats and tank outlet once yearly to remove rust and sediment. Inside cleaning extends tank life and keeps water quality steady.
