Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Capital
Western toilet installation in Sharq usually happens inside office or residential towers near Sharq Marina and the NBK Head Office. We book the service lift, register with building security, and bring the new pan up protected, so the work fits the tower's rules from arrival to handover.
Tower work in Sharq, between Kuwait Towers and Sharq Marina, runs on permits and time slots. Many buildings allow noisy work only in set hours and require debris to leave through the service lift, never the passenger lifts. We confirm those rules in advance, cut and remove the old pan quietly where drilling is restricted, and carry out the old unit bagged. Water isolation is arranged with the building engineer, since risers often serve several floors from one valve.
Sharq is the capital's waterfront business district, stretching from Kuwait Towers to Sharq Marina and the NBK Head Office.
In high rise buildings a single riser valve can feed several floors, so shutoffs are coordinated with building engineers.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It helps if you tell management the date. We send them our team details and follow their access and working hours rules.
Only if your toilet has no local isolating valve. In that case the riser is closed briefly with the engineer, and we fit a local valve so it is not needed next time.
