Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Farwaniya
Epoxy lining in Abdullah Mubarak requires full tank drainage and sanding of rust and flaking deposits. Hot air circulation dries any remaining moisture before coating application. Camera testing confirms even coverage with no defects.
Tanks in Abdullah Mubarak, especially older ones, face sharp temperature swings due to proximity to the Sixth Ring Road. Expansion and contraction cause fine cracks where rust creeps in. Thick epoxy coating fills these cracks and isolates the metal from damp air completely.
Abdullah Mubarak sits in Farwaniya governorate near Abdullah Mubarak Co-op and the Sixth Ring Road.
Two epoxy coats are applied with a 4-hour interval between them because the first coat must cure fully before the second.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Epoxy reduces moisture on tank walls, which limits algae growth conditions. However, regular tank cleaning remains necessary to prevent bacterial buildup.
With proper application and yearly cleaning, the coating lasts 5 to 8 years. Re-coating requires the same drainage and surface prep steps.
