Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Ahmadi
Epoxy tank lining in Ahmadi begins with complete drainage and scraping the inner walls free of silt and deposits. We sand the surface smooth with power tools until every crack is clean, then apply a protective epoxy coat from floor to roof.
Most rooftop concrete tanks in Ahmadi city sit on family villas and face intense sun and interior humidity. After years, fine cracks and fractures weep slightly, and epoxy seals these cracks from inside to stop water seeping into the concrete itself. We climb to the roof with an air pump and small tank to reach every corner and fissure, then drain and inspect the new coat with an underwater camera.
Ahmadi is an oil governorate on Kuwait's southern gulf coast, where villas are built on raised ground that lifts roof tanks well above sea level.
After coating, the tank is filled with clean water for hours before use because fresh epoxy needs time to cure completely.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Draining, scraping and rinsing the walls takes a full day, drying needs one night, then coating takes half a day. We leave the epoxy to cure for forty-eight hours before refilling the tank.
Rated epoxy resists ultraviolet and heat, but the tank itself grows very hot in summer. The coat stays strong for many years if you clean the walls of algae once a year.