Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Capital
Epoxy tank lining in Daiya starts by draining the tank completely and grit-blasting the inner walls to remove sediment, corrosion and old paint. We apply three rated epoxy coats then inspect with a camera before handover.
Most Daiya houses were built in the 1980s and 1990s, and their roof tanks face fierce sun exposure that speeds paint breakdown and rust. Salt and mineral deposits from hard water accumulate on the inner walls, and epoxy shields them from this decay. When stripping old paint we often find small pitting in the metal that needs filling and sanding before coating.
Daiya lies near the British School and Daiya Park, a quiet residential zone where roof tanks are the main source of cool water supply.
Each coat is checked under light before the next layer goes on because trapped moisture ruins adhesion.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Draining and blasting takes a full day on a standard tank, then we wait 24 hours between each epoxy coat for curing. The total is usually four or five working days.
No, because water breaks the coating bond before final curing. We test for complete dryness before filling the tank to ensure every layer has fully hardened.