Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Hawalli
Epoxy tank lining in the Ministries Area protects water tanks exposed to harsh seasonal changes. We fully drain the tank, clean walls by scraping and sanding, apply rated epoxy layers and test for leaks before refilling.
Government buildings in the area hold large rooftop tanks to meet high demand during long working hours. These tank walls face direct sun and daily temperature swings, causing fine cracks in steel and concrete. Epoxy flexes with thermal expansion and seals both visible and microscopic cracks, stopping water loss and preventing interior rust. Before coating, we camera-inspect the tank floor and walls for existing weak spots.
The Ministries Area sits in Hawalli governorate, where central government buildings are equipped with tanks under severe thermal stress.
Every tank is tested by slow filling for a full hour to catch any seepage before handover.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, it must be fully emptied and ventilated because moisture prevents epoxy adhesion. We use a sump pump and wait for walls to dry before scraping and cleaning.
Usually three days: draining and cleaning on day one, epoxy coats on days two and three with drying time between. Then we slowly refill and inspect before handover.