Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Capital
Epoxy lining in Mirqab starts with older residential building tanks near the Central Market and Grand Mosque. We completely drain, scrape deposits, treat rust, dry thoroughly and apply epoxy layers with precision.
Tanks in dense Mirqab apartment blocks are typically shared across multiple units and under steady pressure from upper floors. Rust and lime deposits have built up over years on walls, and water seeps slowly through old cracks. Before coating we use a wire brush and weak acid to remove every trace of rust and salt.
Mirqab is an older residential area in the capital near the Central Market, marked by multi-storey apartment blocks with shared tanks needing regular maintenance.
We dry the tank with air fans before coating because any remaining moisture weakens epoxy adhesion.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, fully cured epoxy has no odour. We run pumps for hours to flush lines before restoring service to residents.
We apply three thin even coats, each fully cured before the next. Three layers give reliable protection against corrosion and seepage for years.
