Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Capital
Epoxy tank lining in Abdullah Al-Salem begins with complete drainage and scraping internal walls of sediment and rust. We pressure-wash the surface, allow pores to dry, apply corrosion-resistant epoxy coats and inspect with a camera before handover.
Abdullah Al-Salem has many villas and family homes with roof-mounted tanks exposed to direct sunlight and high temperatures. Older tanks develop algae and sediment layers on the walls, and water may taste metallic from rust. Epoxy seals the concrete walls and prevents reaction with water, and when we apply it we check surface temperature to ensure proper curing conditions.
Abdullah Al-Salem lies in the capital near the British Embassy, a residential zone where most tanks sit on house roofs.
Before starting, we sample tank water to assess sediment level, because thick deposits require longer cleaning time.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the tank must remain empty and dry throughout coating and curing. Full hardening takes 72 hours before the tank can be refilled.
Yes, the corrosion-resistant epoxy we use is formulated for temperatures up to 60°C. We do suggest fitting an insulating cover over the tank top to reduce thermal expansion and heat absorption.
