Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Capital
Epoxy tank lining in Nahda starts with draining the water and scraping the entire interior wall to remove sediment and rust scale. We apply the protective epoxy coat after testing pH and moisture, then inspect the seal with an industrial camera before refilling.
Dense residential towers in Nahda near the Fourth Ring junction rely on large roof tanks that distribute water to dozens of units. Tank walls exposed to sunlight corrode rapidly inside because the water carries dissolved minerals and clay particles that settle. We grind the interior surface deeply with powered tools and vacuum all dust before epoxy application, or the coating will peel within months.
Nahda lies in Kuwait governorate near the Fourth Ring Road junction, where high-rise residential buildings concentrate and require regular tank renewal.
We inspect the cured coat with a thermal imaging camera because hairline cracks may not be visible to the naked eye.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We leave the coat for seven days to reach full hardness under normal ventilation. We test the epoxy surface before authorizing refill.
Epoxy seals the surface so it does not corrode or release harmful minerals, but it cannot stop algae if sunlight enters the tank directly. We recommend adding a foam insulation layer on the roof.
