Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Jahra
Epoxy tank lining in Nasseem starts with complete drainage and scraping rust and sediment from floor and walls. We sand the inside surface with a rotating machine then pressure-wash until bone dry. Then epoxy coats go on smooth, a light check by camera, and the tank runs again.
Nasseem has many older villas with steel roof tanks that shed rust into the water supply, leaving a brown tint and metallic taste that residents complain about. An old tank does not need full replacement if its walls are sound with no punctures, because epoxy lining seals the rust inside and stops oxide mixing with the water. We use an inspection camera first to confirm there are no holes or deep cracks that would make coating inadequate.
Nasseem lies in Jahra governorate, a residential district that relies on roof tanks for drinking water storage, making regular maintenance essential.
Every tank is inspected by camera first because deep rust means coating alone will not be enough.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, the tank must be completely empty and bone dry inside before any coating begins. Even a single drop of water stops the epoxy from adhering properly to the walls.
Rated epoxy withstands roof tank temperature swings in Jahra without cracking or peeling. We ask about the tank color though, because white tanks reflect heat while black ones absorb more.
