Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Jahra
Epoxy tank lining in Sulaibiya begins with complete tank drainage and scraping the floor, walls and ceiling until all sediment and rust are gone. We wash the surface with alkaline solution, apply food-grade epoxy coat and wait for full cure before refilling.
Water tanks in Sulaibiya face direct sun and intense heat that accelerates concrete cracking and internal rust on reinforcement bars. Most tanks here sit on steel or concrete towers, which makes draining and scrubbing easier because gravity does the work. Before coating we check concrete condition closely and test surface pH because epoxy does not bond to alkaline or damp surfaces.
Sulaibiya is a desert area in Jahra governorate where farms and houses rely on large storage tanks, and epoxy lining extends their working life.
Lining takes four full days from drainage to camera inspection because cure time between coats is long in high heat.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, epoxy requires a full seven days minimum to harden fully and become safe for drinking water. We leave the tank empty and dry, and only refill after the full cure period ends.
We stop work, photograph the crack and tell you its size and location before continuing. Deep cracks need concrete repair first, then lining, which is separate work from the coating itself.