Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Capital
Epoxy tank lining in Rai protects commercial centers and warehouse tanks from sediment and corrosion. We drain completely and scrape accumulated debris with heavy tools. We apply epoxy in multiple coats and inspect coverage with a camera before refilling and restart.
Large commercial centers and warehouses in Rai have massive tanks serving hundreds of staff and visitors daily, with much heavier sediment load than residential tanks. We start with full drainage and vacuum-extract bottom deposits before high-pressure water cleaning. Huge tanks need more epoxy coats and longer drying time between layers.
Rai is a commercial zone in Kuwait City around The Avenues Mall, IKEA and many modern shops and warehouses.
We test water flow in the tank supply and return lines before system restart to ensure filters are not clogged.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A large commercial tank needs three to four days for drainage, cleaning, coating and cure time. We work nights to minimise downtime to the shop.
No, water touching wet epoxy spoils the coat and causes later peeling. We wait for full cure before any use, even if it delays shop opening by hours.