Crack welding
direct thermal weld along each fracture line in the tank wall

Jahra
Tank welding in Qaisariya addresses cracked tanks in homes, shops and small farms scattered across the area. We pinpoint leaks by pumping and pressure testing, remove oxide and debris around the crack, weld using localized fusion technique and full-capacity test the tank before leaving.
Tanks in Qaisariya near Jahra expressway are spread over scattered houses and small shops, mostly plastic or fibreglass mounted on very low roofs. Tanks here suffer direct sun exposure and lack routine maintenance, causing gradual breakdown of plastic material. We check tank colour and wall flexibility before welding, because brittle plastic may not retain a new weld even if initially sound.
Qaisariya in Jahra is a mixed residential area with small shops and simple farms where weak old tanks are very common.
We test plastic flexibility with light-pressure testing before welding because weak tanks may collapse under full pressure testing.
direct thermal weld along each fracture line in the tank wall
re-welding inlet and outlet fittings where the flange joint has failed
resin-and-mat layer over the damaged zone before the final weld seal
internal camera after welding reveals any weak point before refilling
replacing the tank lid when the leak source is the cover seal
written record of weld locations and camera inspection result
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test with gradually rising low pressure and monitor closely. If distortion or uneven bulging appears, the tank is not worth welding and replacement is the answer.
An old plastic tank with new welds should be used cautiously at first. We recommend inspecting the weld every three months in the first year, and if new cracks appear elsewhere, replacement time has come.
