Inspection and mapping
Internal camera maps every crack and spalled area before work starts

Capital
Water tank restoration in Shuwaikh usually starts with inspecting large steel tanks exposed to salt air from the port. We assess rust, leaks and interior corrosion, then scrape the walls, apply protective lining and test safely before return to service.
Shuwaikh towers and warehouses depend on large tanks holding cooling and daily-use water, and salt air accelerates rust on both outer and inner surfaces. We measure metal thickness with ultrasonic gauging and identify areas weakened by oxidation. An epoxy lining protects the structure from inside and stops rust particles entering the water, which matters for industrial processes that need clean supply.
Shuwaikh sits on the Kuwait City coast near Shuwaikh Port, where the harsh marine environment makes tank maintenance necessary every few years.
Internal welds are soaked in chemical test solution to detect micro-cracking before lining.
Internal camera maps every crack and spalled area before work starts
All scale, efflorescence and loose material removed before any filler is applied
Hydraulic mortar seals active and dry cracks in concrete walls and floor
Repair render restores corroded or pitted wall surfaces to a uniform face
Drinking-water rated coating applied over fully cured and prepared surfaces only
Camera confirms coating integrity and joint sealing before the tank refills
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use ultrasonic thickness gauging at ten or more points on the tank walls. If readings are uniform the metal is sound, and if they drop in spots there are deep pits needing grinding and patching before lining.
It lasts five to seven years under salt water and harsh industrial duty. We test it one year after application by full hydrostatic load to confirm adhesion across the entire inner surface.
