Live pressure reading
Measuring cut-in and cut-out values before touching anything

Mubarak Al-Kabeer
Sabhan Industrial has warehouses and workshops that need steady water supply throughout the day and a faulty switch stops production. We read pressure accurately and adjust the switch to deliver stable flow without interruptions.
Sabhan Industrial factories are large with very high rooftop tanks and thick pipes to handle greater volume. The switch here operates at higher pressure than family homes because water demand is greater. When the switch fails, water stops to machinery and facilities at once, and the problem may be vessel leakage or incorrect cut settings. We access the roof and measure pressure under full load, inspect the vessel body and connections, then set cut-in and cut-out points precisely.
Sabhan Industrial in Mubarak Al-Kabeer is a zone of factories and warehouses where pressure switches operate under continuous high-pressure conditions.
Before leaving, we run the pressure for at least one hour to confirm no leaks appear in the vessel or joints under load.
Measuring cut-in and cut-out values before touching anything
Testing the air bladder charge and refilling it if pressure is lost
Cleaning contacts or fitting a new switch matched to pump capacity
Calibrating both thresholds precisely to prevent rapid on-off cycling
Inspecting wiring and terminal resistance at both switch contacts
Running the pump and confirming stable pressure through a full cycle
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the reading drifts slightly from the set point, repair is enough. But if the vessel is corroded or the switch itself will not hold its setting, replacement is more reliable.
Most warehouses run water from morning until sunset at least, and the switch cycles throughout all production hours. This heavy use causes faster wear, so testing every three months is prudent.
