Tank and line check
Tank size and pipe run checked before any pump is chosen

Mubarak Al-Kabeer
Installing a roof tank pump in Sabhan Industrial serves warehouses and workshops requiring steady water for production. We check high-pressure lines and large tanks, selecting a heavy-duty pump for intensive use. We fit safety valves, robust isolation and test continuous pumping for a full hour before handover.
Sabhan Industrial buildings have high ceilings with tanks above thick main-line pipes. We check main-line diameter first because warehouses need high flow, and an undersized pump will cut supply during peak use. We fit a pump rated for the distance from the lower collection trap to the upper tank, with a safety valve protecting the line from over-pressure.
Sabhan Industrial is a warehouse and factory zone in Mubarak Al-Kabeer governorate, where high roof tanks serve continuous production operations.
The pump runs through one complete cycle listening for abnormal noise and vibration before final acceptance.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on tank size and available pressure. If the tank exceeds three hundred litres and main-line pressure is low, we fit a single powerful pump or two in parallel. We test them together to fill the tank within reasonable time for factory operations.
Yes, only if the hot line comes from a separate electric heater downstream of the pump. We install an isolation valve before the heater to disconnect the pump during service. If the heater is mounted before the tank, hot water will be lost when the pump stops.
