Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Farwaniya
Sewage pumping in Ardhiya requires checking the long drain line from the house to the co-op pit near the industrial zone. A pump strong enough to lift sewage over distance and height is selected. It is installed with secure pipes, an insulated tank and tested under full operation before handover.
Ardhiya sits between Farwaniya and the industrial zone, with uneven foundation depths. Some lines pass under major roads before reaching the co-op pit. Distance is longer than nearby areas, requiring a pump capable of sustained lift. A larger reception tank is installed to match the longer line. Electrical switches and strainers are carefully tested to prevent stopping at peak discharge times.
Ardhiya is in Farwaniya governorate near the industrial zone, a residential area close to major highways.
Pump pressure is checked with a gauge and the suction strainer is cleaned before operation to prevent air cavitation in long pipes.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, every extra metre increases pressure loss. We calculate length, diameter and bends then choose a pump with enough power to lift. Larger diameter pipes reduce loss but need more floor space.
We choose larger diameter pipe and the most direct route possible. A larger reception tank allows fewer pump cycles. A stronger motor handles the distance, but electricity use rises slightly.
