Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tank installation in Daiya starts by positioning the tank on the roof or underground depending on yard space and available supply. We size the tank to match two days of household use, connect the feed line from the meter, fit the lift pump and filters and test every joint.
Many Daiya houses were built in the same period on a clay base, with flat roofs and few openings. A precast concrete tank is lifted by pallet jack or mobile crane straight onto the roof, and we check the foundation seal before connecting. The supply line runs from the meter either under the foundation or along the external wall depending on the existing layout.
Daiya sits in Kuwait governorate, a quiet residential area near the British School of Kuwait and Daiya Park.
After handover, the tank is filled completely and all foundation joints are watched for an hour to check for seepage.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A rooftop tank needs lifting equipment and roof reinforcement, but is easy to maintain and clean. An underground tank requires deep digging in clay and groundwater testing before burial.
Yes, the lift pump needs checking at least yearly for the seal, filter and wiring. If water stops suddenly, sand or rust from the supply line may have clogged the pump impeller.
