Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Farwaniya
Water tank installation in Dajeej faces desert-fringe climate and sandy soil challenges. We choose strong overhead tanks that withstand intense heat and winds, or excavate underground in weak sandy conditions. We prioritize heavy thermal insulation and pipes resistant to corrosion and direct sun.
Dajeej is a gradual desert zone where summer temperatures soar enough to affect water quality in tanks. Sandy shallow soil makes deep digging difficult and unsafe in many places. We prefer overhead tanks mounted on strong concrete bases wrapped with thermal insulation layers to prevent water heating. We route pipes to minimize direct sun exposure and choose metals that resist rust quickly in the dry environment.
Dajeej in Farwaniya governorate sits on the desert fringe, where the climate is hot and dry and soil is sandy and weak-bearing.
In Dajeej we test tank heat tolerance by filling with water and leaving it in direct sun for hours before moving to the next job.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Digging deeper than one and a half metres in sand is risky because walls collapse easily. We choose an overhead tank instead, set it on a thick concrete base and wrap it thickly against heat.
We use high-grade copper or UV-resistant plastic pipes. We wrap them with thick foam insulation and place white reflective covers on any exposed necessary pipes to bounce heat away.
