Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tank installation in Dasma starts by checking an apartment building's roof capacity to bear the full tank weight. We size the tank by flat count and daily use, run supply pipes from the main riser and waste to the public network, then pressure-test every joint before handover.
Dasma apartment blocks near the city centre have strong concrete roofs and most have a central water riser running from ground floor to roof. This riser gives a natural distribution point: we measure its bore and current pressure, then connect flat branches from one point instead of running separate pipes from the tank. The tank itself sits on a defined concrete base so the rising pipe doesn't protrude above roof level more than needed.
Dasma is in Kuwait governorate, a residential area close to the city centre containing multi-storey apartment blocks with established water systems.
We inspect feed filters and risers for white scale deposits before lifting the tank because sand and calcium block outlet heads.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test the old tank first by filling it and waiting one hour to check for leaks or rust in the base. If it holds and its volume matches current demand, we clean it thoroughly and put it back in service.
When the current mains pressure is less than one metre of head above the tank location, a booster pump draws water directly from the network and pushes it upward. We measure static pressure first, then size the pump by the building's daily consumption.
